Home

FACTORYTECH USA

Sample Factory Solutions

BUILD MY FACTORY · GUIDED WORKFLOW

Have an opportunity but need a production plan?

We help assess the product, process, equipment, and investment pathway. Explore curated sample workflows as starting points for human-led feasibility review—not final designs or supplier offers.

STATUS: ILLUSTRATIVE MODEL

Every supplier, price, lead time, and planning assumption is illustrative and unverified.

  1. 01
    Explore an opportunity

    Start with a resource and an intended market. Validate both in the proposed location.

  2. 02
    Review the process

    Explore a preliminary workflow, then validate capacity, yields, utilities, safety, and staffing with specialists.

  3. 03
    Prepare supplier requirements

    Use equipment categories to frame a brief. Actual suppliers, origin, specifications, and commercial terms require verification.

California$330K–$450K equipment-only planning range

Illustrative planning estimate—not a quotation. Actual costs depend on final capacity, specifications, equipment origin, supplier quotation, freight, insurance, duties, taxes, site conditions, utilities, installation, local compliance, training, and working-capital requirements.

Cold-pressed olive oil

From: Mission & Arbequina olives

An illustrative estate-pressing opportunity using locally sourced olives.

Validate harvest supply, pressing yield, product demand, and distribution economics. Table-olive curing would require a separate process and scope.

Market
Specialty grocers, farm shops, restaurant distributors
Capacity
2–4 tons of olives per day
Mango belt$280K–$390K equipment-only planning range

Illustrative planning estimate—not a quotation. Actual costs depend on final capacity, specifications, equipment origin, supplier quotation, freight, insurance, duties, taxes, site conditions, utilities, installation, local compliance, training, and working-capital requirements.

Dried mango + fruit puree

From: Carabao & Tommy mangoes

A potential split-intake line for dried fruit and food-service puree.

Validate seasonal supply, drying losses, demand, and preservation method. Shelf stability and aseptic processing are not established by this model.

Market
Snack brands, hotels, juice & dessert makers
Capacity
3–5 tons of fresh fruit per day
Cacao highlands$330K–$460K equipment-only planning range

Illustrative planning estimate—not a quotation. Actual costs depend on final capacity, specifications, equipment origin, supplier quotation, freight, insurance, duties, taxes, site conditions, utilities, installation, local compliance, training, and working-capital requirements.

Couverture chocolate + cocoa butter

From: Fermented cacao beans

Move up the value chain instead of exporting raw beans.

Validate fermentation quality, additional recipe inputs, refining and pressing yields, and actual buyer specifications before comparing value-added options.

Market
Craft chocolate makers, bakeries, cosmetic buyers
Capacity
1–2 tons of fermented beans per day
Philippines$310K–$420K equipment-only planning range

Illustrative planning estimate—not a quotation. Actual costs depend on final capacity, specifications, equipment origin, supplier quotation, freight, insurance, duties, taxes, site conditions, utilities, installation, local compliance, training, and working-capital requirements.

Extra-virgin coconut oil + coconut flour

From: Mature coconuts

High-value oil from abundant local harvests, with flour from the same press cake.

Validate fresh-kernel supply, oil separation method, food safety, yield, and buyer requirements. Copra and fresh-kernel oil processes are not interchangeable.

Market
Natural grocers, export distributors, cosmetic manufacturers
Capacity
2–4 tons of fresh kernel per day

YOUR LINE · CALIFORNIA

Cold-pressed olive oil line

From orchard bin to sealed bottle: a six-stage cold-press line sized for a first commercial mill.

Footprint
≈ 800 m² incl. warehousing (illustrative)
Team
12–16 production operators across 2 shifts
Output
Saleable oil output requires validated extraction yield; table-olive processing excluded
Budget
$360K equipment-only planning estimate

Illustrative planning estimate—not a quotation. Actual costs depend on final capacity, specifications, equipment origin, supplier quotation, freight, insurance, duties, taxes, site conditions, utilities, installation, local compliance, training, and working-capital requirements.

Planning assumptions to validate

Status and location
Illustrative model. California growing region; seasonal harvest contracts, fruit quality, transport time, trained labor, and access to buyers must be confirmed. Temperature-controlled handling may be needed.
Hourly, shift, and daily capacity
125–250 kg fresh olives/hour averaged over 16 scheduled hours. 1–2 tons intake per 8-hour shift; two shifts/day. 2–4 tons of olives per day. These are average input planning assumptions, not rated machine speeds. Downtime, cleaning, seasonality, and yields require validation.
Facility and utilities
Three-phase power, potable wash water, drainage, wastewater and pomace management, cleanable food-contact areas, ventilation, and suitable oil storage. Connected load, water demand, compressed air, and temperature-control needs require supplier sizing. The floor-area figure is illustrative, not a facility design.
Staffing scope
12–16 production operators across 2 shifts is illustrative. Supervision, maintenance, quality control, sales, and supply-chain staffing must be planned separately.
Market requirements
Validate retail and food-service demand, bottle formats, labeling and oil-quality requirements, food-safety controls, traceability, and destination standards. Certification and buyer acceptance are not assumed.
Implementation timeline
Illustrative equipment lead times appear below. Shipping, site preparation, installation, commissioning, and training are additional workstreams; a project schedule follows supplier and site review. No deployment date is committed.
Capital scope and exclusions
Equipment-only model: the budget is the sum of the illustrative rows, not delivered equipment or turnkey deployment. Freight, insurance, duties, taxes, civil works, utility upgrades, site preparation, permits, certification, installation, commissioning, training, working capital, and professional services. Unlisted process branches and ancillary equipment are also excluded.
Potential technology applications
Batch traceability, extraction-yield monitoring, predictive maintenance, and demand forecasting, subject to data availability. AI-assisted scenarios would require human and technical validation.
  1. 01

    Wash & sort

    Clean, grade, and destem incoming olives.

    Rotary washer + optical sorterHeartland Processing Co. · Illustrative supplier placeholderOhio, USA is a fictional location; origin unverified.
    $42,000 · illustrative equipment price

    Illustrative planning estimate—not a quotation. Actual costs depend on final capacity, specifications, equipment origin, supplier quotation, freight, insurance, duties, taxes, site conditions, utilities, installation, local compliance, training, and working-capital requirements.

    Illustrative lead time: 10–12 weeks
  2. 02

    Crush & malax

    Mill fruit into paste and condition it for oil release.

    Hammer crusher + malaxation tanksGulf Coast Extraction Systems · Illustrative supplier placeholderTexas, USA is a fictional location; origin unverified.
    $78,000 · illustrative equipment price

    Illustrative planning estimate—not a quotation. Actual costs depend on final capacity, specifications, equipment origin, supplier quotation, freight, insurance, duties, taxes, site conditions, utilities, installation, local compliance, training, and working-capital requirements.

    Illustrative lead time: 12–14 weeks
  3. 03

    Centrifuge & clarify

    Separate oil from paste; extraction yield and quality require validation.

    Two-phase decanter + disc-stack centrifugeBlue Ridge Separation Works · Illustrative supplier placeholderNorth Carolina, USA is a fictional location; origin unverified.
    $82,000 · illustrative equipment price

    Illustrative planning estimate—not a quotation. Actual costs depend on final capacity, specifications, equipment origin, supplier quotation, freight, insurance, duties, taxes, site conditions, utilities, installation, local compliance, training, and working-capital requirements.

    Illustrative lead time: 12 weeks
  4. 04

    Settle & filter

    Reduce suspended solids; final quality specifications depend on the intended market.

    Settling tanks + plate filterPrairie DryTech · Illustrative supplier placeholderKansas, USA is a fictional location; origin unverified.
    $46,000 · illustrative equipment price

    Illustrative planning estimate—not a quotation. Actual costs depend on final capacity, specifications, equipment origin, supplier quotation, freight, insurance, duties, taxes, site conditions, utilities, installation, local compliance, training, and working-capital requirements.

    Illustrative lead time: 10 weeks
  5. 05

    Bottling & labeling

    Fill, cap, and label retail and bulk formats.

    4-head filler + wraparound labelerLakeshore Packaging Systems · Illustrative supplier placeholderWisconsin, USA is a fictional location; origin unverified.
    $68,000 · illustrative equipment price

    Illustrative planning estimate—not a quotation. Actual costs depend on final capacity, specifications, equipment origin, supplier quotation, freight, insurance, duties, taxes, site conditions, utilities, installation, local compliance, training, and working-capital requirements.

    Illustrative lead time: 10–12 weeks
  6. 06

    Casing & palletizing

    Case-pack finished goods for distribution.

    Case erector + semi-auto palletizerCascade End-of-Line · Illustrative supplier placeholderOregon, USA is a fictional location; origin unverified.
    $44,000 · illustrative equipment price

    Illustrative planning estimate—not a quotation. Actual costs depend on final capacity, specifications, equipment origin, supplier quotation, freight, insurance, duties, taxes, site conditions, utilities, installation, local compliance, training, and working-capital requirements.

    Illustrative lead time: 8–10 weeks
FOR BUYERS

Plan the path to deployment.

We help configure the production line and coordinate the path to deployment. Qualified partners validate design, site suitability, process performance, and commercial assumptions under an agreed scope.

FOR U.S. SUPPLIERS

Bring capabilities to integrated projects.

Eligible suppliers may be considered for defined production requirements after capability and origin review. Sample participation is not a listing, endorsement, or promise of orders.

START WITH AN INFORMED DECISION

Tell us what you want to produce.