U.S. equipment. Factory development.

Plan your factory.
Find the equipment.

FactoryTech USA helps entrepreneurs assess production opportunities, plan equipment needs, and connect with U.S. suppliers and technical partners.

Explore equipment
Product feasibility · Equipment sourcing · Installation & training
Industrial robots along an automotive production line
01 / ON THE FACTORY FLOORRobotics & production systems
How FactoryTech works
Product development Factory planning Expansion

THE FACTORYTECH MODEL

Support for each stage
of your factory.

Start with a product assessment, plan a new facility, or identify improvements to an existing operation.

01

Build My Product

Assess demand, define product requirements, and review process feasibility before selecting equipment.

02

Build My Factory

Plan equipment, site requirements, procurement, installation, and training for a new production facility.

03

Grow My Factory

Review production constraints and identify upgrades to capacity, quality control, and automation.

PROJECT SCOPE

Product assessment Equipment & capital Installation & training Operations

EQUIPMENT & PRODUCTION SYSTEMS

Explore equipment by process.

Browse processing, packaging, fabrication, and automation systems. Use an equipment request to describe the capacity and configuration you need.

THE EQUIPMENT COLLECTION3 OF 6 SYSTEMS
PROCESS · FILL · FINISHFT-01

Modular preparation, processing, and filling equipment for food and beverage production.

FILL · SEAL · LABELFT-02

Filling, sealing, labeling, and end-of-line packaging configured for your product and container format.

CUT · FORM · CREATEFT-03

Machining, cutting, and forming equipment selected for your materials, tolerances, and production volume.

Need equipment for a different process?

BUILD MY FACTORY · GUIDED WORKFLOW

Have capital but no product yet? We design the line for you.

Tell us where you are and we'll suggest what your region can make — then configure the complete microfactory, from raw material to packaged product, with every machine matched to a verified U.S.-origin supplier. Use the line as a starting point for a sound enterprise investment decision.

DEMO · MOCK DATA

Sample case study. Suppliers & pricing illustrative.

  1. 01
    Discover opportunities

    Have capital but no product? We start from a credible product opportunity based on your location's local resources — like olives in California.

  2. 02
    Design the microfactory

    Pick a product and we configure the full production workflow from raw material intake to finished, packaged goods.

  3. 03
    Match U.S.-origin machinery

    Each stage — extraction, filtration, bottling, packaging — links to the exact machine and the verified U.S. manufacturer behind it.

California$330K–$450K turnkey estimate

Cold-pressed olive oil + table olives

From: Mission & Arbequina olives

Premium oil from Central Valley groves, with cured table olives from the same harvest.

California grows nearly all U.S. olives. Estate pressing keeps the margin now lost to bulk brokers and imports.

Market
Specialty grocers, farm shops, restaurant distributors
Capacity
2–4 tons of olives per day
Mango belt$280K–$390K turnkey estimate

Dried mango + aseptic puree

From: Carabao & Tommy mangoes

Two SKUs from one intake line: shelf-stable snacks and food-service puree.

Seasonal gluts crash farmgate prices. Drying and puree lines turn surplus into year-round revenue.

Market
Snack brands, hotels, juice & dessert makers
Capacity
3–5 tons of fresh fruit per day
Cacao highlands$340K–$460K turnkey estimate

Couverture chocolate + cocoa butter

From: Fermented cacao beans

Move up the value chain instead of exporting raw beans.

Local cooperatives already ferment. Small-batch refining and pressing keeps margin in-country.

Market
Craft chocolate makers, bakeries, cosmetic buyers
Capacity
1–2 tons of nibs per day
Philippines$310K–$420K turnkey estimate

Extra-virgin coconut oil + coconut flour

From: Mature coconuts

High-value oil from abundant local harvests, with flour from the same press cake.

The Philippines is among the world's top coconut producers with established processing labor. Cold-pressed oil sells at a multiple of copra.

Market
Natural grocers, export distributors, cosmetic manufacturers
Capacity
2–4 tons of copra per day

YOUR LINE · CALIFORNIA

Cold-pressed olive oil line

From orchard bin to sealed bottle: a six-stage cold-press line sized for a first commercial mill.

Footprint
≈ 800 m² incl. warehousing
Team
12–16 operators over 2 shifts
Output
Up to 700 L of oil + 500 kg table olives daily
Budget
$360K equipment estimate
  1. 01

    Wash & sort

    Clean, grade, and destem incoming olives.

    Rotary washer + optical sorterHeartland Processing Co. · Ohio, USA · U.S.-origin
    $42,000
    10–12 weeks
  2. 02

    Crush & malax

    Mill fruit into paste and condition it for oil release.

    Hammer crusher + malaxation tanksGulf Coast Extraction Systems · Texas, USA · U.S.-origin
    $78,000
    12–14 weeks
  3. 03

    Centrifuge & clarify

    Separate oil from paste to first-press purity.

    Two-phase decanter + disc-stack centrifugeBlue Ridge Separation Works · North Carolina, USA · U.S.-origin
    $82,000
    12 weeks
  4. 04

    Settle & filter

    Polish oil to retail-grade clarity.

    Settling tanks + plate filterPrairie DryTech · Kansas, USA · U.S.-origin
    $46,000
    10 weeks
  5. 05

    Bottling & labeling

    Fill, cap, and label retail and bulk formats.

    4-head filler + wraparound labelerLakeshore Packaging Systems · Wisconsin, USA · U.S.-origin
    $68,000
    10–12 weeks
  6. 06

    Casing & palletizing

    Case-pack finished goods for distribution.

    Case erector + semi-auto palletizerCascade End-of-Line · Oregon, USA · U.S.-origin
    $44,000
    8–10 weeks
FOR BUYERS

We plan the line — you just build it.

Unlike generic B2B directories that leave you guessing what to buy, FactoryTech plans the complete production line and tells you exactly which machines to purchase, with space, staffing, and budget requirements included.

FOR U.S. SUPPLIERS

Your equipment, featured in turnkey microfactories.

When international buyers view complete turnkey factory solutions, your verified U.S.-origin equipment is featured inside them — matched to a specific production stage, with your specs, pricing, and lead times in front of qualified projects.

PROJECT PLANNING

Plan for the operation,
not just the purchase.

Equipment selection depends on what you will produce, who will buy it, and what your site and team can support.

Our model covers product feasibility, finance readiness, procurement, installation, and operator training. Each stage helps define what the project needs before the next commitment.

Explore technical and finance partnerships
FROM ASSESSMENT TO OPERATIONS
01 / ASSESS

Product demand
& production requirements

Equipment
& process design
+
Finance, site
& team readiness
02 / PREPARE FOR PRODUCTION

Installation, training
& commissioning

A metalworker grinding steel, with sparks illuminating the workshop
Equipment expertise.Installation support.
FT / SUPPLIERS

FOR U.S. EQUIPMENT SUPPLIERS

Connect your equipment
with international projects.

We’re building a network of U.S. manufacturers, authorized suppliers, and systems integrators. Tell us which processes you support, where you deliver, and how you handle installation and service.

  • Equipment matching by process and capacity
  • Defined installation and training requirements
  • After-sales service and maintenance planning
For manufacturers, authorized suppliers & systems integrators.

PARTNERSHIP AREAS

Help finance, install,
and support production.

We’re seeking partners in equipment, finance, logistics, technical services, and workforce development.

WORKING WITH FACTORYTECH

Share your capabilities, geographic coverage,
and the project stages you can support.

START A PROJECT BRIEF

Tell us what you want to produce.